Title

title.png

Ordering the glass

Michelle works on working up the order for glass. It could take 2-3 months to get the materials

99EFB939-9350-4F78-8002-58FD8F02E509_1_105_c.jpeg
9AFFDDA3-8AAB-4D70-9D3A-4A18BAE93134_1_105_c.jpeg

Working on the patterns

 Coding the pattern for color

Coding the pattern for color

 Tracing the full size pdfs

Tracing the full size pdfs

6E0391F8-ED64-4B8D-B173-08956955CDA8_1_102_o.jpeg
6E0391F8-ED64-4B8D-B173-08956955CDA8_1_105_c.jpeg
2076386B-392C-46E9-B144-2D4FCBC22C04_1_105_c.jpeg

Cutting begins

883A80C3-BFDD-43A2-8C51-370C7873B974_1_102_o.jpeg
5213210F-7FE8-4181-AB77-7B46EFAD8F3A_1_105_c.jpeg
CEB22177-AD72-42DC-8D0E-991BD7F5BBD2_1_102_o.jpeg

Painting details

Michelle begins the process of panting the black details onto the grape leaves

 April 16, 2026 received deposit to begin fabrication.

April 16, 2026 received deposit to begin fabrication.

CC3F6201-7437-4952-969A-B4C458768732_1_105_c.jpeg
AB6959C0-AD8B-4011-9690-6CCDEE6470AA_1_105_c.jpeg
8E613967-9E0D-4B70-A70B-0C566A65D23E_1_105_c.jpeg

Listing the glass

Choosing the glass, making the glass order, painting leaves and cutting glass

 Cleaning up the painting before firing in the kiln

Cleaning up the painting before firing in the kiln

32E128A1-2D79-4CAB-9B72-7C016D48F1DD_1_105_c.jpeg
DD784A6F-C870-4F0B-AA65-BFEF82822EAE_1_105_c.jpeg
 Laying out the designs and patterns to calculate the quantities of glass we need to order

Laying out the designs and patterns to calculate the quantities of glass we need to order

   Glass cutting continues

Glass cutting continues

 Michelle in the glass room filling in colors from our personal collection

Michelle in the glass room filling in colors from our personal collection

 Michelle continues to cut glass for the center window group panels

Michelle continues to cut glass for the center window group panels

 Working pattern and tools

Working pattern and tools

Cutting continues

F4496231-46A3-41AC-8FEB-06B8BC42838C_1_105_c.jpeg
146D80FB-6F8D-4576-A09C-4FCDB250D857_1_105_c.jpeg
2D7984A0-C49D-4BE2-AE88-BD72557066AE_1_105_c.jpeg
F6AE9FF0-C1F5-483C-B4D7-DDD4CA6FBF15_1_105_c.jpeg
3A7F3C17-1232-4A34-8FF1-241F8A23A554_1_105_c.jpeg
EF59E4E5-EFA6-4FE7-8E99-7392319838A2_1_105_c.jpeg

Cutting compete on first panel

91A182F8-7E7D-4DBE-B065-05D4F9F43F5F_1_105_c.jpeg
8A5BB3E8-56F1-42F0-9E98-D5170C57E1E7_1_105_c.jpeg
CDC97CE0-63D2-4406-A151-BB33F786BB59_1_105_c.jpeg

Assembly Begins

Panels under construction

 Assembly of the first panel proceeds to  completion

Assembly of the first panel proceeds to completion

 Completed assembly awaits glazing

Completed assembly awaits glazing

 The first panel is glazed and cleaned on the front side ready to be turned over and completed on the back side.

The first panel is glazed and cleaned on the front side ready to be turned over and completed on the back side.

   the second panel is completly  cut out ready for assembly

the second panel is completly cut out ready for assembly

Work continues

 Second panel completely cut out

Second panel completely cut out

 First panel completely assembled

First panel completely assembled

7E0082BF-5F76-4716-ADD1-ABA956AC0C86_1_105_c.jpeg
 First panel cemented on the first side

First panel cemented on the first side

 Michelle begins cutting third panel

Michelle begins cutting third panel

 third panel partially cut out

third panel partially cut out

8F324A32-B5E6-4D2E-B441-65332B2007B0_1_105_c.jpeg
 Detail of second assembly

Detail of second assembly

 Second assembly partial

Second assembly partial

May 28, 2026

David and Michelle work at cutting and assembling panels for the central transom window group

 David working on the grinders

David working on the grinders

 David works on the intricate assembly of the fig tree panel

David works on the intricate assembly of the fig tree panel

 Michelle works at cutting glass

Michelle works at cutting glass

 Partially assembled panel for central transom window group

Partially assembled panel for central transom window group

 Michelle cuts glass using her headlamp to provide additional light

Michelle cuts glass using her headlamp to provide additional light

 Progress on cutting window panel #4

Progress on cutting window panel #4

Work continues May 30, 2026

Michelle finishes cutting glass for the central transom window group while David finishes a very intricate assembly

 Progress on Panel #4. Glass cutting complete

Progress on Panel #4. Glass cutting complete

 Panel #4 completed except for leaf pieces removed for painting

Panel #4 completed except for leaf pieces removed for painting

 Completed assembly of Panel #2

Completed assembly of Panel #2

 Michelle gestures to her box of very tiny scraps of glass

Michelle gestures to her box of very tiny scraps of glass

 Completed assembly of Panel #2

Completed assembly of Panel #2

July 11, 2026

The glass arrives as work continues on the Transom Windows.

  Fig window back side


Fig window back side

 Crate of glass from Bendheim contains  the German mouth blown glass for the Transom Window Project

Crate of glass from Bendheim contains the German mouth blown glass for the Transom Window Project

 documenting the crate contents upon arrival

documenting the crate contents upon arrival

37BBD98A-04A6-4926-AFC6-4A6F96668428_1_105_c.jpeg
 Michelle unloads the glass from the crate

Michelle unloads the glass from the crate

June 21, 2026

   the fig leaf panel is in its crate and on the table for final cleaning

the fig leaf panel is in its crate and on the table for final cleaning

64BE9E5E-9A3E-4A27-9D6B-EA716C3C6259_1_102_o.jpeg
 sheets of glass stacked in the studio

sheets of glass stacked in the studio

4EF331AC-54E0-4B2C-A25B-E31EF5F0350B_1_102_o.jpeg
 Michelle works on laying out the next panel for fabrication

Michelle works on laying out the next panel for fabrication

 panel #3 under fabrication

panel #3 under fabrication

Juneb 26, 2026

Work continues on all panels in different stages of completion.

 Beginning of the assembly of pnel #4. One piece down

Beginning of the assembly of pnel #4. One piece down

 The assembly proceeds one piece at a time. Here is the progress after one day.

The assembly proceeds one piece at a time. Here is the progress after one day.

 Close up of the assembly in process.

Close up of the assembly in process.

 Completed assembly

Completed assembly

 Michelle works on the pattern for the butterfly panel

Michelle works on the pattern for the butterfly panel

 Layhing out the butterflies.

Layhing out the butterflies.

 Cutting out the butterflies.

Cutting out the butterflies.

July 2, 2026

 First two crated panels ready for delivery.

First two crated panels ready for delivery.

 The West Window Group left side panel, cuttiing nearly complete.

The West Window Group left side panel, cuttiing nearly complete.

 Sidelight from the central window group transfered to its frame.

Sidelight from the central window group transfered to its frame.

 Removing the masking from the panel whivh was placed there to protect the glass while the rebar is being spray painted black.

Removing the masking from the panel whivh was placed there to protect the glass while the rebar is being spray painted black.

 A window hangs from the hoist while being lowered to the floor.

A window hangs from the hoist while being lowered to the floor.

 Cleaning the backside of this sidelight panel in the central window group

Cleaning the backside of this sidelight panel in the central window group

  Miichelle labels the crates.

Miichelle labels the crates.

July 12, 2026

63E4F0E8-07CD-4118-A9C9-94E7AE356677_4_5005_c.jpeg
918D5C8D-1628-417B-AC92-8FF5D6037A01_1_105_c.jpeg
6EA7A9CA-D659-471A-ACB2-4C1682CD6416_4_5005_c.jpeg
962759DD-89C0-4959-ADA5-9E5C9279ACF8_1_102_o.jpeg
70F5EB5C-46D9-45AB-AC41-238045A5A2B8_1_102_o.jpeg
79D39289-6D42-4D62-846D-1D66EB978B2F_1_105_c.jpeg
5DEE48AA-7FD6-46C0-B917-AC9AAD094E0A_1_105_c.jpeg

Preparing the butterflies

working on panel #6

 Design and pattern

Design and pattern

 Pattern

Pattern

 Laying out the birds

Laying out the birds

 Choosing the glass

Choosing the glass

 Michelle coming out of the glass room

Michelle coming out of the glass room

Firing the butterflies

 Background pieces are marked for saw cutting to fit

Background pieces are marked for saw cutting to fit

   butterfly pieces in the lay out

butterfly pieces in the lay out

 The butterfly piees have been removed from the lay out

The butterfly piees have been removed from the lay out

   the butterfly pieces are brought back from the air brush table to have resist removed

the butterfly pieces are brought back from the air brush table to have resist removed

 Michelle removing the resist from the buttderfly pieces ready to fire

Michelle removing the resist from the buttderfly pieces ready to fire

 Butterfly pieces ready to fire

Butterfly pieces ready to fire

    butterfly pieces with resist removed are placed into the kiln ready for firing

butterfly pieces with resist removed are placed into the kiln ready for firing

prev / next
Back to Camp Newman Transom Windows Stained Glass Fabrication Project Journal
1
Title
2
Ordering the glass
 Coding the pattern for color
5
Working on the patterns
3
Cutting begins
 April 16, 2026 received deposit to begin fabrication.
4
Painting details
 Cleaning up the painting before firing in the kiln
8
Listing the glass
6
Cutting continues
3
Cutting compete on first panel
 Assembly of the first panel proceeds to  completion
4
Assembly Begins
 Second panel completely cut out
9
Work continues
 David working on the grinders
6
May 28, 2026
 Progress on Panel #4. Glass cutting complete
5
Work continues May 30, 2026
  Fig window back side
5
July 11, 2026
   the fig leaf panel is in its crate and on the table for final cleaning
6
June 21, 2026
 Beginning of the assembly of pnel #4. One piece down
7
Juneb 26, 2026
 First two crated panels ready for delivery.
7
July 2, 2026
7
July 12, 2026
 Design and pattern
5
Preparing the butterflies
 Background pieces are marked for saw cutting to fit
7
Firing the butterflies